TitleProduct

Compact Rubber Mixing Mill

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Shandong

  • Validity to:

    Long-term effective

  • Last update:

    2020-05-23 20:49

  • Browse the number:

    318

Send an inquiries

Company Profile

Qingdao Beishun Environmental Protection Technology Co., Ltd

By certification [File Integrity]

Contact:qdbeishun(Mr.)  

Email:

Telephone:

Phone:

Area:Shandong

Address:Shandong

Website:http://www.qdbsmachine.com/ http://qdbeishun.scctyy.com/

Product Details


Applications

The compact rubber mixing mill is widely used in the milling process of rubbers and rubber products. The final material can be transported to rubber calender, batch off cooler, rubber extruder, rubber vulcanizing press or other processing machines for the heating, pressing, breaking, plasticizing and mixing of rubber or plastic products.


Product description

Product description

1.The compact rubber mixing mill occupies a small area.


2. The compact rubber mixing mill is equipped with a hardened gear reducer. Gears are all treated by carburizing and quenching techniques. The gear surface is carefully grinded as well. Such processes increase machining accuracy, wear-resistance and reduce noise. 


3. The friction gears of the compact rubber mixing mill sit between the roller and reducer to avoid cooling water and condensate water from entering into lubricating oil trough. 

4. The compact rubber mixing mill is equipped with a stock blender that is usually only used in rubber kneader machines. The advantages of this include a decrease in machine labor intensity and it reduces the mixing time and working efficiency. The hydraulic gluing process also maximizes operation stability. 


5 The roll adopts the vanadium titanium metal alloy chilled cast iron and its surface hardness 68~72HS is hard and wear-proof. The Rolls are mirror finished & polished, duly grinded and are hollowed for cooling or heating.

6. BEISHUN  each rubber mixing mill need 8 rolling bearing. Adoption of a rolling bearing for the roller helps to minimize friction. A labyrinth seal, instead of an oil seal is used to prevent the inconvenience of replacing the framework oil seal while maintaining.


7. Lubrication: Full Automatic Grease lubrication pump for Anti Friction Roller Bearings fitted in dust sealed housing.


8. Roll Cooling of rubber mixing mill: Universal Rotary joints with inner Spray pipes with Hoses and Headers. Piping is complete up to supply pipe terminal.

XK-160

φ160x320

8.95

1:1.37

5.5

1500x750x1500

XK-230(AZ)

φ230x600

10.21

1:1.19

15

2800×1200×1120

XK-250(AZ)

φ250x620

14.1

1:1.17

18.5

3400×1500×1650

XK-300

φ300x750

15.1

1:1.25

22

3500×1600×1700

XK-360

φ360x900

16.25

1:1.25

30

3780×1850×1750

XK-400

φ400x1000

18.65

1:1.27

37

4350×1850×1785

XK-450

φ450x1200

24.26

1:1.27

55

5200×2380×1840

XK-560(AZ)

φ560x1530 
φ510x1530

27.72

1:1.2

90

5845×2284×1978

XK-550B

φ550x1500

27.94

1:1.22

110

5870×2475×2045

XK-610

φ610x2000

28.42

1:1.17

160

7070×2290×1840

XK-660

φ660x2130

28.6

1:1.24

245

7465×3662×2080

XK-710

φ710x2200

30

1:1.09

280

7500×3500×1800


FAQ

Q1:Why choose Us?

More than 15 years history of BEISHUN factory.

More than 8 years foreign sales experience staff, more efficiency and professional.

Engineers oversea service more than 30 countries .


Q2:What about delivery date?

It will be according to the quantity of machines. Normally machines will be shipment within 25-35 days after get deposit.

Accept urgent order for prompt shipment.


Q3:How does your factory control the quality of machines and after sales service?

All BEISHUN machines have 12 months or 24 months guarantee, will be provided for a lifetime maintenance.

BEISHUN will assume no liability for labor costs, installation costs, or other losses. 


Q4:What about Beishun oversea service? How long will it take?

Beishun will arrange oversea setting up and training works if customer need. Customer should pay for accommodation , tickets and salary .

Small machine usually takes within 3~5 days.

Big plant usually takes about 30 days.


http://www.qdbsmachine.com/